Arlington Park Improvements Project
Mobilization; traffic control and construction signage; patch paving, pavement delineation; striping and pavement marker installation; concrete removal and replacement, concrete joint repair, site furnishings, building renovation, and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Status
Bidding Closed
Prebid Date | 8/29/23 1:00pm |
Bid Date | 9/12/23 2:00pm |
Company
City of El Cerrito
Location
City of El Cerrito
The Engineer’s estimate for construction for the work is approximately $285,000
A Non-Mandatory pre-bid conference will be held at 1p.m., on Tuesday, August 29, 2023, at the project site at Arlington Park Clubhouse, 1120 Arlington Boulevard, El Cerrito, California, 94530