El Cerrito Del Norte Transit-Oriented Development (TOD) Complete Streets
Construction of curbs, gutters, sidewalks, pedestrian ramps, street lights, traffic signals, drainage, seal coat, striping, landscaping, and irrigation as shown on the Plans, as called for in the Specifications, and as directed by the Engineer.
Status
Bidding Closed
Prebid Date | 10/11/23 2:00pm |
Bid Date | 10/26/23 2:00pm |
Company
City of El Cerrito
Location
City of El Cerrito
The Engineer’s estimate for construction is $9.5 million for the base bid. The estimate with all alternatives is $10.3 million.
A mandatory pre-bid conference will be held at the City Offices at 10890 San Pablo Avenue, El Cerrito, CA 94530, at 2:00 p.m., on October 11, 2023. ONLY BIDDERS THAT ATTEND A MANDATORY PREBID CONFERENCE ARE QUALIFIED TO BID ON THIS PROJECT. Bidder’s attendance will be determined by the Bidder’s representative’s signature on the City’s Pre-Bid Conference Sign-In Sheet.