Gladys Avenue, El Dorado Street and B Street Improvement Project
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Mobilization; traffic control and construction signage; cold planning; edge grinding; roadway excavation; AC patch paving; AC paving; concrete sidewalk, curb and gutter, driveway, curb ramp; tree removal and planting; pavement; traffic signs; delineation; striping and pavement marker installation and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Status
Bidding Closed
Prebid Date | 7/20/21 2:00pm |
Bid Date | 8/5/21 1:00pm |
Company & Contacts
City of El Cerrito
Ana Bernardes, abernardes@ci.el-cerrito.ca.us
510-215-4382
Location
City of El Cerrito
NON-MANDATORY PRE-BID CONFERENCE: TUESDAY, JULY 20TH, 2021 @ 2:00 PM
BIDS DUE BY: THURSDAY, AUGUST 5TH, 2021 @ 1:00 PM
ENGINEER’S ESTIMATE: $475,000