2022 Manila Avenue Storm Drain Repair
Mobilization; traffic control and construction signage; roadway excavation and construction, storm drain pipe and inlet construction; concrete sidewalk, curb and gutter, driveway construction, mulch installation and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Status
Bidding Closed
Bid Date | 6/28/22 1:00pm |
Company & Contacts
City of El Cerrito
Gerardo Avila - gavila@ci.el-cerrito.ca.us
925-890-9796
Location
City of El Cerrito
ENGINEER’S ESTIMATE: $81,000