Carlson Boulevard and San Diego Street Crosswalk Improvements- City Project C5048
The general items of work to be done hereunder consist of: Mobilization; traffic control and traffic signage; furnishing and installing equipment necessary for a rectangular rapid flashing beacon system including assemblies, control equipment, wireless communications, solar panels, pushbuttons, posts, foundations, pullboxes, conduits and trenching, removing and salvaging existing signs and posts, removing post anchor and concrete pads, and replacing concrete sidewalk flags; grinding of tree stump; work related to the installation of a new streetlight including conduits and trenching, pullboxes, connecting to existing service, and installation of the streetlight pole and associated equipment; and any other such items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, places, constructed, or installed to form a complete installation.
Plans
(click to expand/collapse)
Name | Size | ||
Carlson-San Diego RRFB 100% Plans 2021-01-25_signed | 1.8 MB |