Rebid - Arlington Blvd. Guardrail Replacement
Acquire a non-fee encroachment permit with the City, attend to a pre-construction meeting and weekly meetings with City staff, mobilization, traffic control (submittal of engineering stamped traffic control plan and implementation of traffic control maintaining one lane open at all time during construction), submittal of storm water control plan and implementation of BMP's, protection of existing improvements and trees, construction temporary signage; clear and grubbing, removal and properly disposal of the existing damaged guardrail in two locations, installation of new Midwest guardrail, and new traffic signs.
Bid Documents
(click to expand/collapse)
Name | Size | ||
Arlington Guardrail Project Specs C3081.A - 04.28.22- Final | 1.4 MB |