2022 Slurry Seal Project, No. C-3027.23
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Mobilization; traffic control and construction signage; patch paving, crack seal, slurry seal; pavement delineation; striping and pavement marker installation and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Addendum 1
(click to expand/collapse)
Name | Size | |||
2022 Slurry Seal - Addedum-01 with Attachment | 349.3 KB |